রবিবার, ২২ নভেম্বর ২০২৬, ০৪:০৮ অপরাহ্ন




Parts of Dhaka go underwater as 130mm rain recorded in 6 hours

আউটলুক বাংলা রিপোর্ট
  • প্রকাশের সময়: শুক্রবার, ১২ জুলাই, ২০২৪ ৬:১৩ pm
Waterlogging waterlogs waterlog প্লাবন flood Disaster Flood Safety adb Flood Flooding overflow water rain snow coastal storms storm surges dangerous floodwaters floodwater বন্যা কবলিত পানি প্রবাহ প্রবাহিত পানি জোয়ার ভাটা কৃষি জোয়ার-ভাটা দুর্যোগ বন্যা বন্যার্ত পানি
file pic

Friday began with heavy rainfall for the city dwellers.

With 130 millimetres of rainfall in six hours from 6am to 12pm today, many roads in the capital have been inundated.

“From 6am to 12pm, Dhaka recorded 130 millimetres of rain. During cyclone Remal this year, 223 millimetres of rainfall was recorded in 24 hours. However, such heavy rainfall has not occurred recently in such a short period,” said Tariful Newaz Kabir, a meteorologist at Bangladesh Meteorological Department.

Many people were seen wading through knee-deep water to reach their destinations in Kakrail, Mouchak, Malibagh, Shantinagar, Farmgate, Badda, Moghbazar, Mirpur and Khilkhet areas.

The rainwater also entered privately-owned vehicles and CNG-run autorickshaws travelling along the main roads, leading to engine damage and breakdowns, motorists said.

The early morning weekend shoppers of kitchen items, travellers to home for vacation and morning joggers were the worst sufferers, reports UNB.

Monsoon is active over Bangladesh and moderate to strong over North Bay.

One Shah Alam, a private car driver, said he came out from his Mouchak residence around 7am to go to Gulshan but remained stranded for around 40 minutes at a lane in the Mouchak due to waterlogging.

Expressing resentment over the city’s drainage system, the private jobholder said the city is turning into an unlivable city gradually as the low-lying areas usually get submerged after a light downpour.

He urged the authorities concerned to take measures to address the issue immediately.

Meanwhile, Dhaka North City Corporation said 5,000 sanitation workers and 10 quick response teams have been working to remove the rainwater since early morning. On the other hand, Dhaka South City Corporation said it has deployed 100 teams to eliminate waterlogging.

In a press release, Dhaka North said each quick response team consists of ten members. They are operating in ten zones.

Dhaka North said water has already been drained from the major roads.

It has also operated five pumps in the capital’s Kallyanpur area since the morning to remove the water from the streets quickly.

“The water level at the pump is currently at 5.1 metres. There is a risk of flooding in the low-lying areas of Dhaka if it exceeds 5 metres. Since it is not raining now, we expect the water level to drop within a few hours,” said Mohammad Masum, a pump operator at the Kallyanpur Pump House of Dhaka North City Corporation.

“We consider it a danger level if the water height exceeds 5 metres,” he added.

In its release, Dhaka North said it took some time to remove the water due to the continuous heavy rainfall over a short period.

It asked the citizens to call its hotline 16106 if any area still remained waterlogged.

According to the Meteorological Department, rains may increase across the country today. Sky is likely to remain cloudy with less possibility of sunlight.

The Met Office also said landslides may occur at places over the hilly regions of Chattogram and Sylhet divisions due to heavy rain.

As a result, the day and night temperatures of the entire country may decrease. However, rainfall is likely to reduce from tomorrow.




আরো






© All rights reserved © outlookbangla

Developer Design Host BD